Darco has been involved with several phases of the multi-year construction of the wastewater project. Utilizing different methods of installing the new wastewater sewer from directional drilling to digging shafts and coring. We evaluate and decide on the method of installation according to the size, type and depth of piping required. We supplied and installed small and large lift stations from install to commissioning, to completion.